Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
ISSUE ARCHIVE     CURRENT ISSUE     CASE STUDIES   

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login

Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

D4COST Software


Subscribe to Design Cost Data Magazine!


  Manuel Pena, Jr. Elementary School, Page 26Manuel Pena, Jr. Elementary School
ARCHITECT
THE ORCUTT/WINSLOW PARTNERSHIP
1130 N. Second Street, Phoenix, AZ 85004
www.owp.com


Location: 
Phoenix, Arizona
Total Square Feet: 114,049
Construction Period: June 2002 to Jan 2004

CONSTRUCTION TEAM
STRUCTURAL ENGINEER: Caruso Turley Scott, Inc. - 130 S. Priest, Tempe, AZ 85281
GENERAL CONTRACTOR: D. L. Withers Construction, LC - 3220 East Harbour Drive, Phoenix, AZ 85034
ELECTRICAL ENGINEER: McGrew Engineering - 16605 N. 28th Avenue, #104, Phoenix, AZ 85053
MECHANICAL ENGINEER: Kraemer Engineering, Inc. - 16605 N. 28th Avenue, #102, Phoenix, AZ 85053
LANDSCAPE ARCHITECT: T. J. McQueen & Associates, Inc. - 1121 E. Missouri Avenue, #218, Phoenix, AZ 85014


Faced with the challenge of creating a safe and secure campus that could handle the unexpected vandalism and lock-down issues, the design explores opportunities for creating a vibrant, yet safe venue for learning and interaction. The campus is designed on a 13.5-acre site located in West Phoenix, and explores unique relationships between indoor and outdoor spaces. A primary goal was to effectively create educational spaces for both indoor and outdoor spaces.

The adjoining site to the west of the campus is a future city park that creates a great opportunity for sharing outdoor play areas between the city and the district, while the design evolves around the district's vision of creating a K-6 campusstyle school with classroom pods. The buildings collectively enclose a large central courtyard that contains a grassed amphitheater and concrete stage, which is regularly used for outdoor performances. Also, a valuable street presence is accomplished with a strategically placed building on the east end of the school.

The campus has four buildings: Building A, located to the northern part of the site, encompasses classrooms for Grades 1-3; Building B to the west contains classrooms for Grades 4-5; and Building C, located in the south, contains special education, resource and Grade 6 classrooms. Building D is the main building of the campus that encompasses administration spaces, kindergarten classrooms, nurses' area, art, media, band and choir classrooms, P.E./cafeteria and kitchen. Located to the east of the site, Building D was specifically designed as a long building that runs north/south, enclosing the courtyard spaces and providing street frontage. The cafeteria is designed with an operable wall with the idea that the 3,600 square feet of space could be broken down into two spaces, wherein one of the spaces could be used for P.E. instruction.

Each of the four buildings on the campus is designed with a distinctive deeprecess flat-arch entryway. These entryways are essentially frame and stucco with an accent paint that gives them their own unique character. The entry to the main administration building (Building D) is a vibrant three-dimensional space, while the dynamism is revealed at the floor, ceiling and facade levels. A large curved canopy at the entrance, created with steel tube columns and a metal deck, reiterates the idea of establishing an inviting entrance.

In fact, all the spaces between the buildings are connected with curved metal-deck canopies. The outdoor entry also contains a seating area created with integrally colored curved masonry walls and recycled lumber that is primarily used by children while they wait to be picked up by their parents. Colored concrete patterns on the floor create a symbolic path that continues into the main lobby of the building.

Buildings A, B and C are essentially stud walls with a painted stucco finish. Building A explores an interesting concept of outdoor teaching that consists of three pods. Each of these pods has a large common space, covered by a curved metal-deck canopy while surrounded by six classrooms, each with its own set of restrooms. These common spaces are typically used as an outdoor instructional space - used for classes such as art, painting etc.

The design was envisioned with the interplay of various concepts such as daylighting, color, form, shade and shadow. To all intents and purposes, each classroom is designed with a combination of horizontally fixed windows and vertical glass blocks that cater to provide daylighting into the classroom. This cohesive design successfully imparts the visual connection with the outdoors, and endows the students with an isolated, yet interactive location for safe and effective learning.

MANUFACTURERS/SUPPLIERS
DIV 07: Built-Up: Tremco®; Metal: ASC Profiles; Glass Block: Pittsburgh Corning Corp.
DIV 08: Windows: EFCO Corporation.
DIV 09: Metal Framing: Dietrich; Gypsum: Pabco; Paint: ICI Delux; Acoustical Treatment: USG Interiors; VCT: Mannington.


©2014 Copyright DC&D Technologies, Inc. All rights reserved. Email: webmaster@dcd.com